High Netherfauld 1 BESS

High Netherfauld 1 BESS Introduction

The proposal is for a 502MW site with 260 battery energy storage units with associated infrastructure on a former storage site located alongside the M74 at High Netherfauld Farm House. The site is of low grade and is currently predominantly laid with hardcore and therefore there is no loss of agricultural or ecologically sensitive land.

The development as proposed provides additional essential energy infrastructure in support of UK renewable energy generation and carbon reduction policies and targets nationally. The development proposes to support the national drive towards renewable energy with the UK’s commitment to an 80% reduction of greenhouse gas emissions (compared to 1990 levels) by 2050. The installation of a Battery Energy Storage System such as the one proposed for High Netherfauld, assists in mitigating the impact of frequency volatility caused by the renewable energy schemes which are essential to meeting national targets.

High Netherfauld 1 BESS
High Netherfauld 1 BESS detailed plan

High Netherfauld 1 BESS site plan

BESS image

Planning information

A complete overview and all documentation related to the project can be found on the Scottish Government’s Energy Consents Unit website.

https://www.energyconsents.scot/

Project name High Netherfauld 1 BESS
Technology Battery Energy Storage System
Capacity 502MW
Battery units 260
Location High Netherfauld House Farm (beside the M74)
Grid Area Close to Coalburn North Substation
Planning route Scottish Government Energy Consents Unit
ECU reference ECU00006063
Current status Consented

BESS site video

High Netherfauld 1 BESS Site and community presentation gallery